A stream along a section of SR-35 in Fort Payne, between Turner Avenue and Clark Avenue, had eroded the shoulder to the point the asphalt edge of pavement was undermined. The shoulder, near vertical in areas, left no room for vehicles that veered outside the yellow line.

The shoulder was rebuilt with crushed concrete and protected with The RETEM System. The RETEM System was chosen because of its ability to take the irregular shape of the slope and hold the concrete in place.


Contact us now for more information or to request a quote. Our team of experts is here to help you find the best solutions for your needs.
Contact us