GDOT District #4, I-75. GA

Success story main image

Eroded ditch repair

2400

Sq Ft

36

Cu Yd

6

Workers

3.5

Hours

In October of 2021, District 4 installed The RETEM System to repair an eroded ditch along I-75 near mile marker 67.

The 300 FT by 8 FT ditch required 36 YD3 of local Ready Mix. The RETEM System install began at 8:15 AM and was completed at 11:50 AM. The grading of the ditch was conducted the prior day.

The 3000-psi concrete was transported from the Ready Mix truck to the ditch with a backhoe.

“We decided to try The RETEM System because of the ease and speed of installation. After our first installation, we are well pleased with the finished product as well as how fast the install went.”

Cliff Webb

Assisant District Mainteancy Engineer - Assets